TUNNEL VENTILATION SYSTEMS

TUNNEL VENTILATION SYSTEMS :
All systems are built according to NFPA 130 Standard, 250 °C – 1 h. Certified Heat Resistant material. Also EMAK have F300 and F400 certificate for all of our fans axial. The System Fans are tested by Fan Performance Test Code ISO 5801 / BS 848 (British Standard).

İZRAY (İzmir City – Turkey) LRTS System (2001) Phase 1. 250 °C – 1 h.
Smoke fans, Smoke Dampers, Automation system, Including Silencers,
Electric Control Panels with Frequency Driver – Remote Operator Panels and SCADA Integration.
IZRAY OTE FAN SYSTEM (Total Capacity 10 Pieces 50 m3/s – 55 kW ) – 250 °C – 1 h.
CONTROL : YUKSEL PROJE & LOUIS BERGER Inc. ENGINEERING
CONTRACTOR : YAPI MERKEZİ A.Ş.

BURSARAY (Bursa City Turkey) LRTS SYSTEM (2003) – TVF FANS – Phase 1 & Phase 2.
Total 16 Pieces – 108 m3/s (390.000 m3/h – 250 kW) – 250 °C – 1 h.
Each Smoke Fans, Smoke Dampers, Automation system, Silencers,
Electric Control Panels with FrequenceDrivers, Remote Operator Panels and SCADA Integration.
(Turn key Delivery)
CONTROL : YAPI – ICF – KAISER (Earthtech) ENGINEERING.
CONTRACTOR : EMAK LTD.ŞTİ.

Bursaray LRTS SYSTEM(2003) – Peron Fans

BURSA City – F300 Istanbul Metro System (2005) Taksim – Kabatas Funicular System Project Peron Fans – F300

Eskisehir LRTS SYSTEM (2006) – 6 X POWER SUBSTATION PRESSURIZATION – BOMBARDIER

İstanbul Metro System (2007 – 2008) Sishane Station – Peron Fans (Alsim – Alarko)
F300 ( 300 °C – 1 h.)

BURSARAY (Bursa City Turkey) LRTS SYSTEM (2006) – Phase III – Part 1 TVF FANS
2 X 120 m3/s (432.000 m3/h) – 355 kW – 250 °C – 1 h.
1 X 70 m3/s (252.000 m3/h) – 132 kW – 250 °C – 1 h.
Each Smoke Fans, Smoke Dampers, Automation system, Silencers,
Electric Control Panels with Frequency Drivers and Remote Operator Panels (Turn key Delivery)
CONTROL : YAPI – ICF – KAISER (Earthtech) ENGINEERING
CONTRACTOR : YAPI MERKEZİ A.Ş.

iZRAY (İzmir City – Turkey) (2010) LRTS System Phase III – Part 1 TVF FANS
İZRAY TUNNEL FANS
2 Pieces 100 m3/s – 1250 Pa – 200 kW ( 250 °C – 1 h.)
3 Pieces 80 m3/s – 950 Pa – 132 kW ( 250 °C – 1 h.)
2 Pieces 50 m3/s – 1350 Pa – 110 kW ( 250 °C – 1 h.)
CONTROL : YUKSEL PROJE & LOUIS BERGER Inc. ENGINEERING
CONTRACTOR : BOREGE / GÜLÇUBUK

Istanbul Metro System (Istanbul – TURKEY) (2010) – F400 (400 °C – 2h) Seyrantepe Fans
2 X (Total Capacity 64.500 m3/h – 1000 Pa)

BURSARAY (Bursa City Turkey) LRTS SYSTEM(2011) – Phase III – Part 2 TVF FANS
2 X 120 m3/s (432.000 m3/h) – 250 kW
Each Smoke Fans, Smoke Dampers, Silencers , Electric Control Panels with Frequency Drivers
and Remote Operator Panels
CONTRACTOR : YAPI MERKEZİ A.Ş.

GEORGIA–RİKOTİ TUNNEL (2011)
2 Pieces 105 m3/s (360.000 m3/h) – 200 kW – Tunnel Ventilation Fans
2 Pieces 105 m3/s (378.000 m3/h) – 250 kW – F400 (400 ºC – 2h) – Smoke Fans and Dampers
CONTRACTOR : ULTRA A.Ş.

İZRAY (İzmir Metro System) (2011) Phase II – Part 1
6 Pieces 22 m3/s – (37 – 45 kW) – F300
4 Pieces 30 m3/s – (90 –110 kW) – F300
6 Pieces 50 m3/s – (110 –160 kW) – F300
2 Pieces 70 m3/s – (132 – 200 kW) – F300
4 Pieces 100 m3/s – (250 kW) – F400
CONTRACTOR : SİGMA / BOREGE